Construction & Bidding
Daily overhead = monthly overhead ÷ working days; job add-on = daily × job days + permits.
Overhead recovery add-on per job from monthly overhead and job duration. Planning estimates only — verify measurements and local codes on site.
Smart analysis
Tailored to your live inputs and result—guidance only, not professional advice.
Treat this as a planning estimate
Primary result: Bid add-on = $4,400.00. Re-run with optimistic and pessimistic inputs to understand the range—not just a single point.
Scenario studio
Capture two sets of inputs on this device, then see which outcome wins. Share either scenario with a link.
Scenario A
Adjust inputs, then capture this slot.
Scenario B
Adjust inputs, then capture this slot.
Plain-English guide
Confused by a field? Read the short definitions here while you use the tool.
Monthly overhead
The “Monthly overhead ($)” value used in this tool’s formula. Adjust it to see results update live.
Working days/month
The “Working days/month” value used in this tool’s formula. Adjust it to see results update live.
Job duration (days)
The “Job duration (days)” value used in this tool’s formula. Adjust it to see results update live.
Permit fees
One-time or recurring costs that affect total money paid.
Monthly overhead ($)
The “Monthly overhead ($)” field. Default 8000; typical range 500–100000.
Permit fees ($)
The “Permit fees ($)” field. Default 400; typical range 0–10000.
Overhead recovery add-on per job from monthly overhead and job duration. Planning estimates only — verify measurements and local codes on site. Daily overhead = monthly overhead ÷ working days; job add-on = daily × job days + permits. Example: $8k/month overhead, 20 working days, 10-day job + $400 permit → ~$4,400 add-on.
Daily overhead = monthly overhead ÷ working days; job add-on = daily × job days + permits.
Example: $8k/month overhead, 20 working days, 10-day job + $400 permit → ~$4,400 add-on.
Governing formula
Daily overhead = monthly overhead ÷ working days; job add-on = daily × job days + permits.
$8k/month overhead, 20 working days, 10-day job + $400 permit → ~$4,400 add-on.
Example: set Monthly overhead ($) = 8,000, Working days/month = 20, Job duration (days) = 10, then read the result.
Monthly overhead ($)
The “Monthly overhead ($)” field. Default 8000; typical range 500–100000.
Working days/month
The “Working days/month” field. Default 20; typical range 10–26.
Job duration (days)
The “Job duration (days)” field. Default 10; typical range 1–180.
Permit fees ($)
The “Permit fees ($)” field. Default 400; typical range 0–10000.
Construction & Bidding
Occasional email when something new is worth opening. We never share your address. Unsubscribe anytime.
Discover & search
Related tools in Construction & Bidding — strengthening topical internal links.
Same category · 3 tools
Browse all →Construction & Bidding
Calculate bid price, net profit, and margin from materials, labor hours, overhead, and markup.
Construction & Bidding
Compare original vs revised bid margin after scope/cost changes.
Construction & Bidding
Volume in cu yd and 80 lb bags from slab dimensions.
Community
See what others think about this tool, then leave your own rating to help improve CalculioHub.
4.8
out of 5.0
4 reviews
Aisha K.
Mar 12, 2026
Clean layout and the results update instantly. Exactly what I needed for a quick planning check.
Daniel R.
Feb 28, 2026
Very usable on mobile. Would love a save/export option later, but the math feels solid.
Priya S.
Feb 3, 2026
The FAQ section answered my questions before I even had to search. Smooth dark mode too.
Marcus L.
Jan 19, 2026
Simple inputs, clear outputs. This replaced three bookmarks I used to juggle.
Improve this tool
Share an idea, report a bug, or send general feedback for Permit & Overhead Recovery Calculator. Your input helps shape what we build next.