Construction & Bidding
Day cost = crew × hours × rate; piece cost = quantity × piece rate.
Effective hourly and job cost for day-rate vs piece-rate crews. Planning estimates only — verify measurements and local codes on site.
Smart analysis
Tailored to your live inputs and result—guidance only, not professional advice.
Treat this as a planning estimate
Primary result: Day-rate job cost = $1,080.00. Re-run with optimistic and pessimistic inputs to understand the range—not just a single point.
Scenario studio
Capture two sets of inputs on this device, then see which outcome wins. Share either scenario with a link.
Scenario A
Adjust inputs, then capture this slot.
Scenario B
Adjust inputs, then capture this slot.
Plain-English guide
Confused by a field? Read the short definitions here while you use the tool.
Crew size
The “Crew size” value used in this tool’s formula. Adjust it to see results update live.
Hours on job
The “Hours on job” value used in this tool’s formula. Adjust it to see results update live.
Day rate per person ($/hr)
The “Day rate per person ($/hr)” value used in this tool’s formula. Adjust it to see results update live.
Piece quantity
The “Piece quantity” value used in this tool’s formula. Adjust it to see results update live.
Piece rate ($/unit)
The “Piece rate ($/unit)” value used in this tool’s formula. Adjust it to see results update live.
Effective hourly and job cost for day-rate vs piece-rate crews. Planning estimates only — verify measurements and local codes on site. Day cost = crew × hours × rate; piece cost = quantity × piece rate. Example: 3 crew × 8 hrs × $45 vs 120 units × $12 → compare effective $/hr.
Day cost = crew × hours × rate; piece cost = quantity × piece rate.
Example: 3 crew × 8 hrs × $45 vs 120 units × $12 → compare effective $/hr.
Governing formula
Day cost = crew × hours × rate; piece cost = quantity × piece rate.
3 crew × 8 hrs × $45 vs 120 units × $12 → compare effective $/hr.
Example: set Crew size = 3, Hours on job = 8, Day rate per person ($/hr) = 45, then read the result.
Crew size
The “Crew size” field. Default 3; typical range 1–20.
Hours on job
The “Hours on job” field. Default 8; typical range 1–24.
Day rate per person ($/hr)
The “Day rate per person ($/hr)” field. Default 45; typical range 20–150.
Piece quantity
The “Piece quantity” field. Default 120; typical range 1–10000.
Piece rate ($/unit)
The “Piece rate ($/unit)” field. Default 12; typical range 1–500.
Construction & Bidding
Occasional email when something new is worth opening. We never share your address. Unsubscribe anytime.
Discover & search
Related tools in Construction & Bidding — strengthening topical internal links.
Same category · 3 tools
Browse all →Construction & Bidding
Calculate bid price, net profit, and margin from materials, labor hours, overhead, and markup.
Construction & Bidding
Compare original vs revised bid margin after scope/cost changes.
Construction & Bidding
Volume in cu yd and 80 lb bags from slab dimensions.
Community
See what others think about this tool, then leave your own rating to help improve CalculioHub.
4.8
out of 5.0
4 reviews
Aisha K.
Mar 12, 2026
Clean layout and the results update instantly. Exactly what I needed for a quick planning check.
Daniel R.
Feb 28, 2026
Very usable on mobile. Would love a save/export option later, but the math feels solid.
Priya S.
Feb 3, 2026
The FAQ section answered my questions before I even had to search. Smooth dark mode too.
Marcus L.
Jan 19, 2026
Simple inputs, clear outputs. This replaced three bookmarks I used to juggle.
Improve this tool
Share an idea, report a bug, or send general feedback for Crew Day-Rate vs Piece-Rate Calculator. Your input helps shape what we build next.